Garhwal Commissioner Ravinath Raman said, “Earlier, we were told about the probability of about 34 labourers present 180 metres inside the Intake Adit tunnel, and we were digging in that direction. Today, they (NTPC authorities) informed us that the last known worksite of the labourers is a silt filtration tunnel (SFT) 12 metres below the Intake Adit Tunnel and about 72 metres from its opening. With this, the strategy of going up to 180 metres has been changed. Drilling will be done in the SFT and lights with cameras will be lowered into the area.”