Here are the top 5 features of the train:
1. This is the longest and heaviest freight train ever run by the Railways, the national transporter said, adding the train takes about four minutes to cross a station.
2. The amount of coal carried by Super Vasuki is enough to fire 3000 MW of power plant for one full day, officials said. This is three times the capacity of existing railway rakes (90 cars with 100 tonnes in each) which carries about 9,000 tonnes of coal in one journey.
3. The train was formed by amalgamating five rakes of goods trains as one unit.
4. The Railways plans to use this arrangement (longer freight trains) more frequently, especially to transport coal in peak demand season to prevent fuel shortages of power stations, the officials said.
5. The train run by the South East Central Railway left Korba at 13:50 and took 11.20 hours to cover the distance of 267 km.
(with PTI inputs)